C.R.E. No. 24.

Kowloon Canton Railway.

BRITISH SECTION

ESTIMATE.

Main Head

Sub. Head

Kiner. Bridgowork. Bridge No.55. @dom 18' Girder at Pag 83-700. Work Duantity. DESCRIPTION. AMOUNT, Rate. Unit. $ Cts. Item 1 Excavation in foundations, $1,040 1,960 Conorete in foundations. 60 40 cu. ft. Pumping and timbering. 500 2,600 Masonry in superstructure, 35/- cu. ft. 10/ 1,072 00 70 Masonry in bedstone and coping. 2/- ft. 140 F 1,450 Dry stone back. 10/- 10 14 50 1 Span girder 12 ft, landed at Kowloon. Transport, erection & painting. 300 100 Total 3,368 00 Contingincies 10% 204 89 Grand Total 3,149 19

Page 201

Page 201

Edit History

2026-06-04 21:27:17 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
C.R.E. No. 24. Kowloon Canton Railway. BRITISH SECTION ESTIMATE. Main Head Sub. Head Kiner. Bridgowork. Bridge No.55. @dom 18' Girder at Pag 83-700. Work Duantity. DESCRIPTION. AMOUNT, Rate. Unit. $ Cts. Item 1 Excavation in foundations, $1,040 1,960 Conorete in foundations. 60 40 cu. ft. Pumping and timbering. 500 2,600 Masonry in superstructure, 35/- cu. ft. 10/ 1,072 00 70 Masonry in bedstone and coping. 2/- ft. 140 F 1,450 Dry stone back. 10/- 10 14 50 1 Span girder 12 ft, landed at Kowloon. Transport, erection & painting. 300 100 Total 3,368 00 Contingincies 10% 204 89 Grand Total 3,149 19 Page 201 Page 201
Baseline (Original)
201 گاه موی تایبه شاهد noined noolwo 32 H2IT){ AMIT23 TE: C.R.E. No. 24. Kowloon Canton Railway. 109 BRITISH SECTION ESTIMATE. baoli ni M best dur Main Head Sub. Head Kiner. SATONA Bridgowork. Bridge No.55. @dom 18' Girder at Pag 83-700. Work Duantity. DESCRIPTION. AMOUNT, Rate. Unit. $ Cts. $,040 Excavation in foundations, Item 1,960 Conorete in foundations. Pumping and timbering. 2,600 Masonry in superstructure, 10/ 60 40 500 35/- 40/ K X 686 1,072 00 COL 70 Masonry in bedstone and coping. 2/- ft 140 F 1,450 Dry stone back. 10/- 10 14 50 1 Span girder 12 ft,landod at Fowloon. Transport,erention & painting. 300 100 8 8 8 8 8 8 8 8 Total 368 00 101 autorkyudando Contingincies 10% 204 89 Grand Total 3,149 19
2026-06-04 21:27:17 · Baseline
View content

201

گاه موی تایبه شاهد

noined noolwo

32 H2IT){

AMIT23

TE:

C.R.E. No. 24.

Kowloon Canton Railway.

109

BRITISH SECTION

ESTIMATE.

baoli ni M

best dur

Main Head

Sub. Head

Kiner.

SATONA

Bridgowork.

Bridge No.55.

@dom 18' Girder at Pag 83-700.

Work

Duantity.

DESCRIPTION.

AMOUNT,

Rate.

Unit.

$

Cts.

$,040 Excavation in foundations,

Item

1,960 Conorete in foundations.

Pumping and timbering.

2,600 Masonry in superstructure,

10/

60 40

500

35/-

40/

K X

686

1,072 00

COL

70 Masonry in bedstone and coping.

2/-

ft

140

F

1,450

Dry stone back.

10/- 10

14 50

1 Span girder 12 ft,landod at Fowloon.

Transport,erention & painting.

300

100

8 8 8 8 8 8 8 8

Total

368

00

101 autorkyudando

Contingincies 10%

204

89

Grand Total

3,149 19